A project team that files a generic “HTM 02-01” PDF without a date or jurisdiction may accidentally use superseded forms or the wrong operational-management guidance. Both England and Scotland published important 2026 medical gas material, and their documents should be catalogued separately.
NHS England's HTM 02-01 was published 19 August 2026. It provides Part A for design, installation, validation and verification, Part B for operational management, plus editable B-forms. NHS Scotland's SHTM 02-01 lists a 2026 Part A and Part B with specific A-form files. The Scottish site also distinguishes archived earlier editions.
Keep two register lines—not one
| Control point | England | Scotland |
|---|---|---|
| Title | HTM 02-01 | SHTM 02-01 |
| 2026 source | NHS England publication page | NHSScotland Assure publication page |
| Design/verification | Part A | Part A |
| Operational management | Part B | Part B |
| Editable examples | B-form set | Listed A-form set |
| Adoption decision | Project/client/local legal hierarchy | Project/client/local legal hierarchy |
The existence of a publicly downloadable form does not make it compulsory in every hospital globally. The signed project specification and local authority requirements determine the actual compliance and witness plan.
Build an evidence matrix at kickoff
For each system, identify the controlled design drawing, construction inspection, first-fix/second-fix tests, terminal and AVSU evidence, gas quality, alarm results and release/handover record. Do not store all these as an undifferentiated folder called “medical gas certificates”.
| Project stage | Evidence type | Typical document check |
|---|---|---|
| Design freeze | Approved layout and equipment schedule | Revision and service identity |
| First fix | Concealed piping/installation record | Zones, supports, labels, excluded work |
| Second fix | Finished-network integrity evidence | Defined pressure/vacuum test boundary |
| Functional verification | Terminal, isolation and alarm witnesses | Correct service and system responses |
| Handover | Completed drawings, O&M and defect closeout | Date, approver, unresolved exclusions |
| Operation | Permit, maintenance and emergency management | Responsible person and controlled instruction |
The organisation should use its own authorised roles and procedures. A supplier's catalogue statement does not appoint that supplier as the site's clinical authorising person or verifier.
An operational example
During a phased theatre renovation, the main contractor finishes one floor while another remains live. A single project sign-off is insufficient if it cannot identify which oxygen and vacuum branches have been accepted and which remain isolated. Make the area boundaries and witness records legible. Subsequent changes should trigger the hospital's permit and retest process rather than a silent drawing revision.
ISO 7396-1:2016 remains a published international framework, while its prospective 2026 revision was still under publication in mid-November. Use the contract-defined edition and locally adopted guidance without treating a new draft as automatically binding.
Purchasing impact
Ask bidders to supply technical schedules with clearly identified models, service, interface, drawings, delivery quantities and relevant test evidence. Keep factory documents distinct from hospital project forms. BWC Medgas can help with zone valve boxes, outlets and alarm components to approved schedules; the hospital appoints qualified parties for site acceptance.