Knowledge & Resources
Practical technical guidance for planning medical gas installations, selecting components and preparing accurate enquiries.
MGPS technical knowledge & answers
194 published technical resources · Expert topics · Newest first
Technical guidance by region
Local standards and project requirements matter. Select a region to find relevant medical gas equipment and engineering guides.
Explore by technical topic
A comprehensive technical architecture of medical gas pipeline systems, organised by subsystem and engineering lifecycle.
System Architecture & Supply
How medical gas systems are designed, supplied and distributed
Pipeline Components & Interfaces
Gas-specific hardware, connections, isolation and control
Specialist Gas & Vacuum Systems
Vacuum and anaesthetic gas scavenging have distinct technical scopes
Engineering Lifecycle & Safety
Installation, verification, standards and reliable operation

Waste Anaesthetic Gas Exposure Monitoring: AGSS, Ventilation and Staff Safety
An occupational exposure and engineering-controls register separating scavenging performance, theatre ventilation, leak investigation and worker exposure measurements.
Read article
AGSS Terminal Units and Probes: Non-Interchangeability, Inspection and RFQ
An exact model and connector schedule for dedicated AGSS terminal units, probes, pendants and replacement parts that prevents unsafe cross-service substitutions.
Read article
AGSS Commissioning and SHTM A17: Factory, Site and Clinical Handover
An AGSS verification dossier structured around product evidence, installed pipe/terminal acceptance, workstation connection, power-device tests and hospital release.
Read article
AGSS Disposal Capacity for Multiple Operating Theatres: Flow and Diversity Worksheet
Create a design review schedule combining anaesthesia workstation requirements, simultaneous room use, terminal limitations, network resistance and dedicated extraction-plant duty.
Read article
AGSS Leakage and Cross-Connection Prevention: Maintenance Fault Register
A safe fault documentation process distinguishing disposal plant issues, outlet misidentification, leakage at machine interfaces and building pipeline changes.
Read article
AGSS Hospital Tender: Terminal, Disposal Plant and Lifecycle Bid Evaluation
A scope-normalized technical RFQ distinguishing the terminal/probe package, dedicated extraction plant, piping/discharge, commissioning, spare parts and operator exposure controls.
Read article
AGSS Exhaust Discharge: Outdoor Location, Re-Entrained Gas and Environmental Review
An estates engineering worksheet for reviewing discharge termination, fresh-air intakes, nearby windows, neighbors, maintenance and local environmental obligations.
Read article
AGSS Disposal Plant Status and Fault Alarms: Duty, Standby and Monitoring Matrix
A controls and operational handover matrix identifying extraction-device conditions, power loss, sensing failures, designated alarm receiving points and clinical escalation responsibilities.
Read article
AGSS and the Anaesthetic Workstation: Pressure Protection and Handover
A practical checklist for documenting transfer/receiving-system protection, supported disposal connections, accessories and clinical equipment sign-off.
Read article